Use the options and fields on this page when selecting a forecast method other than the PF=1/(a*CPI+b*SPI) and Percent Complete Ranges methods.
Contents
| Field | Description |
| Forecast method
|
Select the forecast method that will be used for the class.
Note: If you select PF=1, Manual Forecast (Retain ETC), Manual Forecast (Retain EAC), or Frozen Forecast, no other options are available.
|
| Forecast Dates
|
Specify whether the forecast spread will be based on early, late, or default forecast dates. The early and late dates are used for best- and worst-case forecast scenarios.
|
| Performance factor level
|
This field controls the level at which Cobra calculates the CPI and SPI.
|
| Code File
|
This field displays if you select any of the levels from 1 to 20 in the
Performance factor level field. Use this field to select a code file to calculate forecasts against.
|